Concrete Bag Calculator — 40, 60 and 80 lb Bags

Work out how many bags of concrete you need, or what the bags you have will cover. Compare yields, pallet counts, mixing water and bags against ready-mix.

Every figure on this page is about bags: one calculator, both directions, with the yield of each bag shown beside it.

Published yield — verify the bag.

%
—
Enter your pour or your bag count to see the conversion.
ad-slot

Bags per Cubic Yard

Published yield and pallet quantity by bag weight. Tap a row to use that weight in the calculator above.

Bag weightPublished yield (cu ft)Bags per cubic footBags per cubic yardBags per palletMixing water per bag
0.3003.3390801.5 qt
0.3752.6772642 qt
0.4502.2260562.5 qt
0.6001.6745423 qt

Published Yields by Product

Yields as published by each manufacturer as of 2026-10-01. Formulations change — always check the printed yield on the bag. Calculatly is not affiliated with any manufacturer named here.

ProductBag weightPublished yieldBags per cubic yardNotes
Generic concrete mix, 80 lb80 lb0.600 cu ft45Standard mix. The default for slabs, steps and general work, and the heaviest bag most people will carry.
Generic concrete mix, 60 lb60 lb0.450 cu ft60Standard mix in a lighter bag. Same uses, easier to lift, more bags per yard.
Generic concrete mix, 50 lb50 lb0.375 cu ft72Small-job size. Check the label, because many 50 lb bags are fast-setting rather than standard.
Generic concrete mix, 40 lb40 lb0.300 cu ft90Smallest common bag. Easy to carry for repairs and tight access, but 90 bags a yard.
Quikrete Concrete Mix, 80 lb80 lb0.600 cu ft45Standard mix. Published yield matches the generic 80 lb bag.
Quikrete Concrete Mix, 60 lb60 lb0.450 cu ft60Standard mix. Published yield matches the generic 60 lb bag.
Quikrete 5000, 80 lb80 lb0.600 cu ft45High-strength mix in the 5,000 psi class for loaded slabs and driveways. Same published yield as standard mix.
Quikrete Fast-Setting, 50 lb50 lb0.375 cu ft72Fast-setting. For posts and small repairs, not slabs: it sets in minutes, leaving no time to finish a large surface.
Sakrete Concrete Mix, 80 lb80 lb0.600 cu ft45Standard mix. Published yield matches the generic 80 lb bag.
Sakrete Concrete Mix, 60 lb60 lb0.450 cu ft60Standard mix. Published yield matches the generic 60 lb bag.
Sakrete Fast Setting, 50 lb50 lb0.375 cu ft72Fast-setting. For posts and small repairs, not slabs, because the working time is too short to finish a surface.

Mixing Time by Method

MethodBags per hourRealistic session limitNotes
Hand mixing in a tub or wheelbarrowAbout 8About 10 bagsAn 80 lb bag is awkward to lift and tip, and concrete starts setting on a clock. Hand mixing more than about 10 bags in one go is a bad afternoon.
Small electric mixer (3 to 4 cu ft)About 18About 40 bagsMixes consistently, but you are still lifting every bag. Placing and finishing, not mixing, usually becomes the limit.
Towable mixer (6 to 9 cu ft)About 3260 to 90 bags with two or three peopleFast enough to keep ahead of the set, but at this scale you are buying about two yards of bags. Compare it with ready-mix first.

How many bags of concrete do you need

Bag counts come from one conversion. A cubic yard is 27 cubic feet, and you divide that by the yield of the bag. An 80 lb bag yields about 0.60 cubic feet, so a yard takes 45 bags. A 60 lb bag yields 0.45, which makes 60 bags a yard, and a 40 lb bag yields 0.30, which makes 90 bags. Lighter bags are easier to carry and cost more to buy and stack per yard, so the choice is about your back as much as the budget.

You need a volume before you can count bags, and that is the step people skip. If the job is not a simple box, the main concrete calculator turns slabs, stairs and columns into cubic feet, which you can paste into the direct volume option above. Then round up, because a part bag cannot be bought.

Here is a full worked example. A 10 × 12 ft slab at 4 in thick is 10 × 12 × 0.333 = 40 cubic feet. Divided by 0.60 that is 66.7, so 67 bags of 80 lb before waste. Add 10% for spillage and an uneven base and you need 44 ÷ 0.60 = 73.3, so 74 bags. That is about 5,920 lb of dry mix to move.

The reverse question matters just as often. Say there are 20 bags in the garage after a finished job. At 0.60 cubic feet each they make 12 cubic feet, or 0.44 cubic yards, enough for a 6 ft × 6 ft pad at 4 in thick. The Bags to volume tab does that sum for any product, so you can decide whether what you own covers the next small job before you drive to the store.

Post holes, fence posts and form tubes are the classic bag job, because each hole needs well under a cubic foot. A 10 in hole 24 in deep holds about a cubic foot once the post is subtracted, so five posts take 8 bags, and the form tube calculator adds tube counts and cutting for round piers. The footing calculator for piers and deck posts covers deeper holes with a belled base, and fast-setting bags suit posts because the mix hardens in minutes rather than days.

Now the break-even. Below roughly 1 cubic yard bags win on convenience: no delivery, no minimum order, no truck waiting. Above it, ready-mix wins on price and strength. At $6.50 a bag, a yard of bagged concrete costs about $292 against roughly $140 delivered, so ready-mix is cheaper per yard at almost any size. What keeps bags in the race is the short-load fee, a flat charge that suppliers add under a minimum order. That fee is a step, not a slope: the ready-mix price jumps by about $100 the moment you order a small load, then drops away at the minimum. With the defaults, the lines cross at about 0.66 cubic yards, or 30 bags. To see how that fee feeds into a whole project, the slab cost calculator prices every line item.

Mixing your own concrete also tends to be weaker in practice, even when the bag is rated for strength. Water is added by eye, and every batch ends up with a slightly different ratio, so strength varies across the slab. Cold joints are the second problem. Each batch starts to set while the next is being mixed, and if the gap is too long the new concrete does not bond to the old, leaving a plane of weakness. A truck delivers one continuous, uniform batch.

Water is where bag mixing most often goes wrong. An 80 lb bag needs roughly 3 quarts, a full yard about 34 gallons. Adding more to make the mix easier to work feels helpful, but every extra splash costs strength, raises shrinkage and invites cracks. Aim for a stiff, wet-oatmeal consistency and let the mixer, not the water, do the work.

Finally, pallets. A pallet of 80 lb bags is roughly 42 bags and weighs over 3,300 lb, which is a delivery rather than a car trip. Pallet counts vary by supplier, but if your bag total passes a pallet the store will often deliver for a modest fee. At that point it is worth asking what ready-mix would cost for the same job.

How to use this calculator

  1. 01Pick a tab. Bags for a pour turns a slab, post hole, column or raw volume into a bag count. Bags to volume works backwards from bags you already own. Bags vs ready-mix prices the same job both ways.
  2. 02On the pour tab, choose a shape and enter its dimensions with a unit beside each one. Mixed units are fine, so a length in metres with a thickness in inches works.
  3. 03Choose the bag from the dropdown. Weight options come first, then specific products, and the yield is the published figure for that bag.
  4. 04Leave the waste allowance at 10% unless your base is very even. Choose the mixer you will actually use so the time estimate matches your day.
  5. 05Read the bags, pallets, weight, water and mixing time as you type. On the third tab, edit the bag and ready-mix prices to your local quotes and read the break-even volume.

Common questions

How many 80 lb bags of concrete make a cubic yard?
It takes 45 bags. A cubic yard is 27 cubic feet and an 80 lb bag has a published yield of about 0.60 cubic feet, so 27 ÷ 0.60 = 45. The same maths gives 60 bags of 60 lb mix and 90 bags of 40 lb mix. Always check the yield printed on your bag, since formulations change.
How many bags of concrete do I need for a 10x10 slab?
At 4 inches thick a 10 × 10 ft slab is 33.3 cubic feet, which is 56 bags of 80 lb before waste and 62 bags with a 10% allowance. At 6 inches it is 50 cubic feet, so 84 bags, or 92 with waste. That is a lot of lifting, so read the break-even section before committing to bags.
How much does an 80 lb bag of concrete cover?
One 80 lb bag yields about 0.60 cubic feet, which covers roughly 1.8 square feet at 4 inches thick, 3.6 square feet at 2 inches, or 1.2 square feet at 6 inches. Divide 0.60 by the thickness in feet to get the area in square feet. Twenty bags cover about 12 cubic feet, or 0.44 cubic yards.
How many bags of concrete are on a pallet?
A pallet of 80 lb bags is commonly 42 bags, about 3,360 lb. Pallets of 60 lb bags usually hold 56, 50 lb bags 64 and 40 lb bags 80. Quantities vary by supplier and brand, so confirm with the store, and remember a full pallet needs a delivery truck rather than a car trip.
At what point is ready-mix cheaper than bags?
With bags at $6.50 each, bagged concrete costs about $292 per cubic yard against roughly $140 for ready-mix, so ready-mix wins on price almost immediately. The short-load fee, often around $100 for orders under about 4 yards, pushes the crossover to roughly 0.65 cubic yards, or about 30 bags. Past about 1 yard ready-mix is also faster and more consistent.
How much water does an 80 lb bag of concrete need?
About 3 quarts, or 0.75 gallons, for an 80 lb bag, with 2.5 quarts for a 60 lb bag and 1.5 quarts for a 40 lb bag. A full cubic yard of 45 bags therefore uses around 34 gallons. Adding extra water makes the mix easier to work but weakens the cured concrete and increases shrinkage cracking.
Is bagged concrete as strong as ready-mix?
The mix itself can be. Standard bagged mixes are commonly rated around 4,000 psi at 28 days and high-strength bags reach 5,000 psi or more, comparable to typical ready-mix. The gap in practice comes from hand batching: inconsistent water, uneven mixing and cold joints between batches usually leave the finished pour weaker than the bag rating.
How many bags of concrete can one person mix in a day?
Hand mixing runs at about 8 bags an hour, but concrete sets on a clock, so about 10 bags is a realistic single session. With a small electric mixer one person can mix about 18 bags an hour, and placing and finishing limit a pour to around 40 bags, or 0.9 cubic yards. Larger pours need helpers or a delivered truck.
What is the difference between concrete mix and fast-setting concrete?
Standard mix includes gravel and cures over days, giving you time to place and finish. Fast-setting mix hardens in roughly 20 to 40 minutes and is poured dry into a hole, then wetted, which suits fence and mailbox posts. A 50 lb fast-setting bag yields about 0.375 cubic feet, or 72 bags per yard. Its short working time makes it a poor choice for slabs.
How many bags of concrete do I need for a fence post?
A 4×4 post in a 10 inch hole set 24 inches deep needs about 0.92 cubic feet of concrete once the post is subtracted, which is 1.5 bags of 80 lb mix. Buy 3 bags for two posts or 8 for five. Deeper holes for gate posts or taller fences take proportionally more, so size them by hole volume.
ad-slot
Related calculators

Bag yields are as published by each manufacturer on the date shown and should be verified against the bag, since formulations change. Pallet quantities and prices vary by supplier and are user-editable defaults rather than quotes. Mixing times are rough estimates. Quikrete and Sakrete are trademarks of their respective owners. Calculatly is not affiliated with, endorsed by or connected to any concrete manufacturer. Last updated: October 1, 2026.